Projects Completed in these fields:canstockphoto2643634

  • Textile
  • Food  processing
  • Chemical
  • Pharmaceutical
  • Infrastructure
  • Environment
  • Tourism
  • Hospitals
  • IT
  • Heavy industry
  • Textile

 

  • Food Processing
    • Nestle SWITZERLAND.
    • Katakeet –UAE
    • Ashad & Betenjana Edible Oil factory for DESMET ITALY
    • Goody cheese Factory
    • Sabano Bulgarian Cheeze SAR.
  • Chemical industry
    • Syriamica (only formica factory in the middle east)
    • Hager for Fatty acid processing
  • Pharmaceuticals
    • Asia Pharma
    • Diamond pharma
    • Masoud & Bahri Pharma
    • Al-Pharis pharma
    • Infrastructure projects in the following field
    • Environment
    • Shaizer-Helfaya WWTP turnkey
    • Water table monitoring in Hasaka city  Turkish boarder.
  • Hotelsseraton
    • Meridian Hotel Damascus
    • ITT-Sheraton Sydnaya
    • Cham Palace hotels chain ( 7-hotels).
    • Four seasons Hotel.
    • ITT-Sheraton Damascus.
  • Hospitals
    • Ministry of Health Tunisia.
    • Ministry of Health Lebanon.
  • IT
  • Television station
    • 400 KVA Power stabilization  & UPS truck for backup and out of location broadcasting.
  • Heavy industry
    • Egyptian General transportations Establishment: Steel , Aluminum, copper smelting factory